PVC Ball Valve – White with Blue Lever

Plumbing Guides

Plumbing Materials Checklist for a New House

A room-by-room plumbing materials checklist for new houses in Nigeria — supply, waste, valves, water storage and finishing — so nothing is forgotten on site.

By Ecemeahara Global Ventures·Updated ·3 min read

Quick answer

A new house needs water source and storage equipment, main supply lines, valves, waste and soil pipes, floor drains, and the fittings for every bathroom, kitchen, laundry and outside point. Pressure-test the pipes before plastering and tiling, while they are still easy to reach.

Key things to know

  • Work room by room so nothing is forgotten on site.
  • Plan valves so each area can be shut off for repairs.
  • Always state sizes and pipe types on your list — “½" PPR elbow”, not just “elbow”.
  • Send your list or BOQ for one price and delivery to site.

On a new building, plumbing happens in stages over many months — and every forgotten fitting means another trip to the market and another day lost on site. Use this checklist with your plumber to plan the full list from the start.

1. Water source and storage

  • Borehole pump or well pump, and its pipes and cable
  • Surface pumping machine (tank to overhead tank or pressure line)
  • Underground and overhead tank connections
  • Float valve for the overhead tank
  • Gate or ball valves on the main outlet and inlet
  • Non-return (check) valve on the pump line
  • Water filter on the main supply, especially with borehole water

2. Main supply lines

  • PVC pressure pipes for outside and underground cold water mains
  • PPR pipes from the tank down into the house
  • Reducers, tees, elbows and unions
  • Pipe clips and fixings

3. Bathroom points (per bathroom)

  • PPR hot and cold supply to basin, shower, WC and shattaf
  • In-wall stopcock
  • Angle valves for WC and basin
  • Hidden shower valve (if used) or rain column connections
  • PVC waste pipes, WC connector and floor drain with trap
  • Hot water pipes and safety valve for the water heater

4. Kitchen and laundry

  • Hot and cold supply to the sink
  • Angle valves under the sink
  • Sink waste, trap and waste pipe
  • Washing machine point with valve and waste
  • Floor drain in the kitchen or laundry

5. Outside

  • Bib taps for the compound, garden and car-wash point
  • PVC roof gutters and down pipes
  • Soil and waste lines to the septic tank or sewer, with inspection chambers
  • Sewer flap valve to stop backflow

6. Consumables and tools

  • Tangit gum (PVC solvent cement)
  • Thread tape
  • Pressure test pump
  • PPR welding machine (for your plumber)

Materials by stage

Stage What goes in
Sub-structure Underground drains, soil lines, sleeves through foundations
Super-structure (first fix) Supply pipes, waste pipes, valves, hidden cisterns and shower valves
Before plastering Pressure test every line
Second fix WCs, basins, mixers, showers, sinks, heaters, floor drain grates
Handover Pump, tank connections, final tests
Plumber’s tip

Always pressure-test the lines before plastering and tiling. Finding a leak while the wall is open costs almost nothing; finding it after tiling costs a lot.

How to estimate quantities

Your plumber will measure runs on site, but you can prepare a good first list by counting points. For each bathroom, count the WC, basin, shower, shattaf and heater. For the kitchen, count the sink and any dishwasher or washing machine point. Then add outside taps, the pump line and the tank connections. Share the count and the building drawings with your plumber so they can estimate pipe lengths and fittings.

Common plumbing mistakes on new buildings

  • Using cold-water PVC for hot water lines — hot water needs PPR.
  • No valves to isolate each bathroom, so the whole house must be shut off for one repair.
  • Waste pipes laid without enough fall, causing slow drains and blockages.
  • No inspection points on soil lines.
  • Skipping the non-return valve on the pump line.

Turn this checklist into a price

Share this list with your plumber, fill in the quantities, and send it to us on WhatsApp or through the BOQ upload page. We will price everything together and plan delivery to your site. See also plumbing materials in Lagos and how much plumbing materials cost.

Get advice

Not sure what to buy? Ask us.

Send your photos, measurements or list on WhatsApp — or call — and we’ll recommend the right product with today’s price and delivery to your area.

Written by

Ecemeahara Global Ventures

A registered building materials dealer (OBMDA Reg. No. 1292) at Odun-Ade Building Materials Market, Badagry Expressway, Lagos. We write about the questions our customers ask us every day. About us · Our founder

What Ecemeahara supplies

Everything in this guide, in our showroom.

Centrifugal Surface Pump – Stainless Head or Cast Body

Centrifugal Surface Pump – Stainless Head or Cast Body

Centrifugal · surface-mounted · single & large models

Swimming Pool Pump with Strainer Basket

Swimming Pool Pump with Strainer Basket

Pool pump · built-in strainer · clear lid

Interior-DAB MKP-70 Peripheral Water Pump

Interior-DAB

Interior-DAB MKP-70 Peripheral Water Pump

Peripheral pump · brass impeller · copper wire

Interior-DAB Automatic Pump Control (EPC-3) with Pressure Gauge

Interior-DAB

Interior-DAB Automatic Pump Control (EPC-3) with Pressure Gauge

Auto on/off · pressure gauge · dry-run help